Thursday, June 6, 2013
ExxonMobil lets contract for Julia field
ExxonMobil Corp. has let what it getting in contact with a “substantial” lump-sum contract to Technip for its Julia oil position venture in the Seaside of South america. The contract contains control, technological innovation, manufacturing, set up, and precommissioning of more than 48 km of 10¾-in. OD successfully effectively properly secured flowlines, metal catenary risers, and flowline end terminations. Although the actual broad wide range of the prize was not declared, Technip says that essential subsea prizes broad wide range €100-250 thousand.
Julia position was found in 2008 with the first well drilled under a 2005 growth contract between StatoilHydro and ExxonMobil in the deepwater beach (OGJ On the internet, Jan. 8, 2008). The preliminary growth stage contains six the taken gaps with subsea tiebacks to the Chevron Corp.-operated Port and St. Malo manufacturing support and is predicted to generate 34,000 b/d of oil beginning in 2016 (OGJ On the internet May 8, 2013). The position contains Professional Variety Prevents 584, 627, 628, 540, and 583 in 7,200 ft of the the the the the water.
ExxonMobil functions Julia position with 50% attention. Statoil maintains the staying attention.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment